This new electricity substation in Hereford, built to improve power supply to the city's homes, was being built from scratch and needed a good, high-spec, fully weatherproof and long-lasting roof from the outset.
We used a guaranteed 20 year protection system, installation as shown in the pictures above.
The polymer system we used - Protec - is also ideal for reinstating existing power substations with zero fall, since Protec is zero fall certified to exceed the designed lifespan.
WHAT NEXT?
This detached building in Hereford required a new warm roof (for more on warm roofing click here) to comply with building regulations and create a cosy environment below. The photographs show the overall building as well as the joists ready for insulation.