This new roof extension on a roof in Brentwood, Essex, was relatively straightforward despite the prominent central skylight and the fact it adjoins the main roof. The polymer system's inherent flexibility means details and joins are no problem.
As the photo shows, the finished roof is jointless and seamless, and "perfect forming" around the central skylight. It was also fully mechanically cured within 72 hrs, fully waterproof and weatherproof within a few hours, and is guaranteed to last.
Want to know more?
One of our more unusual requests!
This one was for a domed traditional style trailer roof/outer near Woking in Cobham, Surrey, which the owner wished to have coated using our verdi green copper-alternative system. The photographs show a step-by-step breakdown of the entire process from start to finish.
We were contacted by another roofing contractor about this semi-detached roof in Stow-on-the-Wold in the Cotswolds, Gloucestershire. At one end, the fibreglass roof was leaking and at the adjacent gable end, the felt roof was leaking.
The two sections, 18m2 and 25m2 needed slightly different treatment. The 25m2 area already held mineral capsheet but was pooling water on top of that, which was seeping through the cracked material. This roof area simply needed overlaying with Liquid Plastic, rendering it jointless, seamless, watertight and weatherproof.