A job in a million! This art deco concrete structure property situated yards from the beach & sand dunes at Ynyslas just north of Borth and Aberystwyth, needed some tricky waterproofing work over the entire flat roof.
Set at the end of the Borth Golf Links, the roof comprises a 120m2 warm room terrace finished in Forest Green decorative quartz. Frameless glass fitted to the internal sides of the parapet walls and a couple of…

Soaking insulation boards were a major problem not quoted for (not known about) in the overlay specification from this NHS Hwyel Dda Health Trust hospital. Replacing this full-tapered insulation system would have cost almost 15k, and the hospital had no other budget left to allocate - which could have scuppered the whole project.
A solution to help our NHS keep extremely important rooms in use was needed... and we found one.
We…

These problematic chimneys, in a conservation area at the old gas works in Aberystwyth, West Wales, needed waterproofing.
The chimney pots themselves were disused, having been capped with matching terracotta ventilation caps, which were removable to allow change of use of the chimney flue.
To begin with, the pointing around the chimney stacks was ground out with flat blade diamond discs to 30mm, then repointed with premixed lime…

This new-build garage in Ceredigion, West Wales, needed fully decking and timber furring (also spelled firring) to create a tilt on the roof, ensuring good drainage. The roof adjoins the wall of the main house, which means particular u-values also needed to be observed.
The end result is a roof that will withstand even the toughest weather Wales can throw at it!
What next?
Check out some of our other flat roof projects…
A 180m2 roof area of National Library of Wales in Aberystwyth is undergoing installation as part of a wider decarbonsation plan for the public sector.
The roof had to be refurbished with a long-lasting jointless and seamless roofing system as the entire roof will be underneath steel RSJs supporting a heat pump. The roof was mastic asphalt covered in chippings & moss. It needed to be cleared and de-chipped, before having all defects…

This single ply membrane roof at the University of Aberystwyth had been leaking for many years. After preparation works, including pressure washing to thoroughly clean the area, three splits were found, necessitating a roof replacement. Polymer roofing is a better-lasting material that doesn't split after time (the degradation process is slower and results in gradual 'chalking' rather than splits or lifts - meaning no water ingress).
…