The Glengower is a traditional sea-front pub and restaurant in the popular West Wales town of Aberystwyth. Its roof was suffering standing water (a major cause of water ingress, mould growth and eventual roof instability).
We removed the standing water by increasing the sump sizes, lowering the outlets and removing the duct work while new waterproofing was applied. After that, the duct work was quickly refitted. The process and our approach eliminated disruption to the hotel, a major consideration in particular for public-facing businesses of this nature.
These portacabin-style dance studios at Aberystwyth University (SY23) were in need of refurbishment involving coating the metal cladding to waterproof it and prolong its life.
We used the Polycoat RoofTec Elite system over the entire exterior - demonstrating the incredible versatility of the polymer system and the range of uses in which it excels.
WHERE NOW?
This residential car park in Belsize Park, Hampstead Heath, Camden (NW3) suffered a serious flood from the upper main road due to on-street rainwater drains being blocked solid from lack of maintenance. Although not historically a flood prone area, heavy rain and flooding wrought by climate change resulted in two houses and three apartments being flooded to a depth of one metre. This led residents to take preventive measures to decrease their reliance on external drain maintenance.
This cold roof terrace in Aberystwyth, West Wals (SY23) supplies upgraded ventilation and new decking for the owners. The whole balcony is jointless and seamless, meaning water drains away readily and the terrace takes advantage of both a Polyroof 20 year waterproofing system and a 10 year quartz system.
WHAT NEXT?
This new electricity substation in Hereford, built to improve power supply to the city's homes, was being built from scratch and needed a good, high-spec, fully weatherproof and long-lasting roof from the outset.
We used a guaranteed 20 year protection system, installation as shown in the pictures above.
The polymer system we used - Protec - is also ideal for reinstating existing power substations with zero fall, since Protec is zero fall certified to exceed the designed lifespan.
WHAT NEXT?
This seafront property in the Cornish town of Falmouth (TR11) required an overlay system for the installation of new composite decking along the entire terrace length. With its location, one of the key specifications for any installation is a very high degree of waterproofing and weather resistance / weatherproofing, which meant the polymer system was ideal.
This roof terrace / balcony area in Caernarfon (Gwynedd, North Wales) had a drainage issue, with water not running off as it should due to a faulty fall. Our job here was to correct the fall and create a roof with proper run-off.
This portable cabin style warehouse office block on a small industrial estate at Berkeley Heath between Bristol and Gloucester (GL13 9EU) needed its roof refurbished.
As usual, we began by meticulously going over the existing roof, clearing debris, pressure-cleaning, making repairs, and so on. Only then do we apply base coat, fully sealing the area. We then applied a high-spec, jointless, seamless top coat that makes water ingress impossible and which is fully fireproof, weatherproof, UV proof, waterproof and more.
FIND OUT MORE:
This property in Kidwelly, Carmarthenshire in South Wales (SA17) required a complete refurbishment of the existing lead awning running the length of one wall and then curving around a corner. As the photographs show, the lead had seriously perished, creating damage to the underlying waterproofing and areas of water ingress.